{"id":15103,"date":"2021-01-01T13:06:00","date_gmt":"2021-01-01T12:06:00","guid":{"rendered":"https:\/\/www.theleansixsigmacompany.com\/uk\/?p=15103"},"modified":"2025-12-23T09:46:45","modified_gmt":"2025-12-23T08:46:45","slug":"smed-method","status":"publish","type":"post","link":"https:\/\/www.theleansixsigmacompany.com\/uk\/library\/smed-method\/","title":{"rendered":"SMED Method"},"content":{"rendered":"\n

The abbreviation\u00a0SMED stands for Single Minute Exchange of Dies and was conceived by the Japanese Shigeo Shingo, an industrial engineer at Toyota. The SMED method strives for a fast and efficient way to change a production process. By \u201cchange\u201d we mean the set of activities required to switch from a current production order to a new production order. The SMED method indicates that each changeover should take less than 10 minutes.\u00a0\u00a0<\/p>\n\n\n\n

SMED step-by-step  <\/strong><\/h2>\n\n\n\n

The SMED\u00a0plan to reduce the changeover time of a system consists of 7 steps. These are as follows:\u00a0<\/p>\n\n\n\n